Skip to main content
Wokingham Borough Council  Home

Putting people first on our streets – Safer Streets programme

We want to improve road safety across the borough and are asking for your views on five initial areas where we are proposing lower speed limits.

In January 2026, we adopted a new speed limit policy. Between 2 March and 2 May, we asked residents which roads and areas should be prioritised in the first phase of the programme. Town and parish councils were also invited to tell us their priorities.

We received 1,911 suggestions from 841 participants, as well as responses from town and parish councils. These suggestions were grouped into 76 areas and assessed against six criteria. Five proposed areas have now been identified for the first phase of the programme. You can view the full assessment process and results in the assessment document at the bottom of the page.

Look at the maps below, then complete the survey to tell us what you think about the proposals.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
1689 participants

Why lower speed limits are being proposed

A high proportion of deaths and serious injuries occur on rural roads, many of which are currently subject to the national speed limit of 60mph.

Lower speeds can also make it safer and more attractive to walk, wheel and cycle. More people walking, wheeling and cycling for local trips has health benefits and is better for the environment. Driving at lower speeds means that driving is smoother, with less rapid acceleration and braking. It also helps to reduce congestion, noise and emissions.

We are also responding to what residents told us during consultations on the Local Transport Plan in 2023 and 2024, when speeding in built-up and rural areas was a major concern.

The five proposed areas

  • Wokingham town centre and Norreys Avenue Estate: an interconnected town centre and suburban residential area
  • Twyford: a village centre and surrounding residential area
  • Finchampstead village: a village centre
  • Silverdale Road, Earley: a suburban residential area
  • Hare Hatch: rural minor roads

Have your say

Look at the maps for the areas you want to comment on, then complete the short survey. You can respond about one or more areas. The survey closes on 9 November.

Click on the areas below to see maps of the five speed limit reduction proposals

How we shortlisted the proposed areas

We used a two-stage process to reduce the long list of suggestions to a shortlist of evidence-based schemes.

Stage 1: initial evaluation

We first removed responses that expressed a general view but did not identify a particular road or area. We also refined suggestions that covered whole towns, neighbourhoods or types of road into specific locations that could be assessed.

For example, suggestions such as 'all residential roads', 'roads near schools' or a whole town or village could not be assessed as individual schemes. Responses like these still helped us understand people’s views, but they did not identify a specific location.

We then considered the most frequently suggested locations alongside the priorities submitted by town and parish councils. This left 76 areas for further assessment.

You can view the assessment of all 76 shortlisted areas, including their scores against six criteria, in the assessment document below.

Stage 2: assessment

We assessed the 76 areas consistently against six criteria:

  • evidence of a road safety issue
  • the likely improvement in safety for pedestrians, cyclists, children and other people at greater risk
  • the likely encouragement of walking, cycling and other active travel
  • likely compliance with a lower speed limit
  • evidence of local community support
  • the scheme can be delivered

The number of times an areas was suggested was considered, but the most frequently mentioned roads were not automatically selected.

As the first-year proposals will be pilots, we also selected a mix of locations: a town centre, village centres, residential areas and rural roads. This will allow us to monitor the schemes to help shape and plan future phases of the programme.

What happens next?

We will consider the feedback and make changes to the proposals where appropriate. We will publish a summary explaining what we heard and how it influenced the schemes.

The revised proposals will then go through the statutory Traffic Regulation Order process. This will provide a further formal opportunity to provide feedback before a decision is made.

Phases

Phases overview
Phase 1: Engagement – public priority location submission period
Engagement – public priority location submission period
Phase 2: Have your say on our proposed 5 areas
Have your say on our proposed 5 areas
Phase 3: Statutory Traffic Regulation Order consultations
Statutory Traffic Regulation Order consultations

Have your say on our proposed 5 areas

12 October 2026 23:00 - 9 November 2026 23:59

Please review the maps before answering our short survey.